Practical Application
Menu
Practical Application
- Implement ECMs to reduce electricity demand before selecting or sizing a PV system.
- Review the energy audit report and implement recommended no- and low-cost savings measures.
- Consider implementing other strategies in this chapter before PV (see Energy: Re-/Retro-Commissioning, Electrical Demand Management, Automatic Lighting Controls, Lighting Equipment and Lamps, and Computers and Office Equipment).
- Consult local solar developers for feasibility of solar power.
- Determine appropriate locations for PV modules.
- Determine life-cycle cost, design, installation, and Cx of the PV system.
- Develop a written system maintenance plan for facility operators to use. Identify cleaning and testing procedures and frequency, as well as resources for future repair and replacement.